|
|
|


|
1.
We start by removing the existing surface
down to the required depth. This will range
from 6 1/2 inches to 12 1/2 inches in depth. |
2.
We then install 3-9 inches of crushed aggregate
base to create a solid foundation. |
3.
Next we place a 1 inch layer of fine bedding
sand to ensure a perfect fit. |
4.
The individual stones are then placed in a
selected pattern. A Vibratory Plate Compactor
is then passed over the top of the stones,
locking them in place.
|
5.
To complete the interlocking process, we sweep
a layer of sand over the top of the stones
and pass the Vibratory Plate a second time.
This forces the sand into the joints. |
|

|